Tile showers, tubs, vanities and full gut renovations. Every wet area gets a proper waterproofing membrane underneath, so it does not leak later.
What's included
01Demolition down to studs or subfloor
02Waterproofing membrane on all wet areas
03Plumbing and valve replacement
04Tile floors, walls and shower niches
05Vanity, toilet and fixture install
06Ventilation fan and lighting
07Glass shower doors
08Paint and trim
How it goes
01CallTell us what needs doing. We book a site visit, usually the same week.
02Site visitWe measure, photograph and talk through options with you. No charge.
03Written priceA line-item estimate and a start date within 48 hours.
04Build + walkthroughOne crew lead on site daily. A final walkthrough and the warranty in writing.
Questions
How long will I be without the bathroom?+
Most full bath remodels take two to four weeks. We give you the exact schedule in writing before we start.
Can you convert a tub to a walk-in shower?+
Yes. It is one of our most common requests, including curbless showers where the floor allows.